01 / Tell us about your parts.
Share the component drawings, material, process requirements and target output. Include your production layout and available site services.
02 / Develop the equipment proposal.
Review the process, fixtures, loading and control connections. Sample testing can help select the arrangement for your components.
03 / Agree the equipment specification.
The technical agreement and contract cover equipment functions, interfaces, acceptance requirements and commercial terms.
04 / Evaluate the equipment.
Factory acceptance uses the agreed components, process conditions and equipment checks. The results are compared with the agreed specification.
05 / Delivery and commissioning.
Prepare shipment, site access and utility connections. Installation and commissioning follow the responsibilities and acceptance steps in the project agreement.

